Ateş Wind Power Commissions Its Own Wind Turbine
A 4.2-Megawatt turbine was built at the company’s factory site
8 August 2026
Wind turbine equipment manufacturer Ateş Wind Power said it has completed acceptance procedures and commissioned a wind turbine installed at its factory site.
According to a statement posted by the company on social media, the 4.2-megawatt turbine’s tower, generator and anchor cage were manufactured at the company’s own facilities.